Winter is slowly loosing its grip on the countryside. The sun is starting to warm a little more every day, and the snow is almost all gone. Still frozen on the lake, but more open water for each day that passed. I was at the boat yard this past weekend and have taken off the lower hinge shoe of the rudder. Will order a replacement for the bronze hinge pin, that is fairly worn down. It measures 66 mm and with a starting diameter of 25 mm. I will order a new pin with outher diameter of 25,5 mm to adjust for wearing of the shoe.
The date for launching is set to 23 April 2021. So, a good seven weeks to get Isabell ready to go back in the water. Looking forwards to it!